SJWC Water Main Installation – Updates Week of 11/4

Dear RESA Community,

The Redwood Estates main thoroughfare is open this week.

Monday (11/4):

  • Work Section: Santa Ana Road where it meets with Bayview Drive (in red above in the map).
  • Road Status: The road will be closed to through traffic and residents living on that section of the street through out the day. WVCC will have flaggers on site to help pedestrian traffic.
  • Water Switching Services: will be taking place this day. See asterisk below.

Tuesday (11/5)

  • Work Section: Santa Ana Road where it meets with Bayview Drive (in red above in the map).
  • Road Status: The road will NOT be closed to through traffic this day. However, the residents living on this road should anticipate work truck traffic.
  • Water Switching Services: will be taking place this day. See asterisk below.

Wednesday (11/6):

  • Work Section 1: Santa Ana Road where it meets with Bayview Drive (in red above in the map).
    • Road Status: The road will NOT be closed to through traffic this day. However, the residents living on this road should anticipate work truck traffic.
  • Work Section 2: Intersection of Bayview and Dorothy.
    • Road Status: Road will have rolling closures throughout the day. Flaggers will control traffic around the detour.
  • Water Switching Services: will be taking place this day. See asterisk below.

Thursday (11/7):

  • Work Site 1: Intersection of Woolaroc/Dorothy/Santa Ana Road.
    • Road Status: The road will be closed to through traffic. Residents living down Santa Ana will be able to exit.
  • Work Site 2: Intersection of Virdelle and Woolaroc/Summit.
    • Road Status: Traffic control flagman will be able to flag one-way traffic around this work area.
  • WVCC Will continue to switch water services over.  See below.

**Water Switching Services: WVCC will have a small crew going to each house and removing the old water service connection from their meter and connecting the new water service. The WVCC crew will knock on the door of the house prior to the switch over (10-20 minute outage). Once the new service is connected, the crew will go to the exterior hose spigot on the house and flush air out of the water line. This work will not require road closures. Residents may experience delays when passing where the crews will be working.

Updates for Thursday will be sent out on Wednesday evening.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 10/28

Dear RESA Community,

The main thoroughfare in Redwood Estates is open next week.

(Map below is for Tuesday only)

Monday 10/28:

  • There will be NO WORK performed this day.

Tuesday 10/29:

  • Work Site: In front of 21580 Santa Ana Road (shown in RED above).
  • Road Status: Residents will be unable to drive vehicles through this work during the day. Residents will be able to walk past the work. 

Wednesday 10/30:

  • There will be no work performed this day.

Thursday 10/31:

  • There will be no work performed this day.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 10/21

Dear RESA Community,

The main thoroughfare in RE is open the entire week.

Monday 10/21:

  • Work Location: Santa Ana Road (in red above).
  • Road Status: The road will be opened to people living on it, however, through traffic is not permitted. Residents may experience delays due to work truck traffic throughout the day.

Tuesday 10/22:

  • Work Location 1: Entire portion of the upper project – Intersection of Bayview and Summit down to Naomi Court (not shown above on the map).
    • Road Status: The road will not be closed for this work. Residents should anticipate water trucks throughout the neighborhood each day.
  • Work Location 2: Santa Ana Road near its intersection with Bayview Drive.
    • Road Status: Closed to through traffic. Residents living on this road will need to park away from the site between the hours of 8am-6pm.

Wednesday 10/23:

  • Work Location: Entire portion of the upper project – Intersection of Bayview and Summit down to Naomi Court (not shown above on the map).
  • Road Status: The road will not be closed for this work. Residents should anticipate water trucks throughout the neighborhood each day.

Thursday 10/24:

  • Work Location 1: Entire portion of the upper project – Intersection of Bayview and Summit down to Naomi Court (not shown above on the map).
    • Road Status: The road will not be closed for this work. Residents should anticipate water trucks throughout the neighborhood each day.
  • Work Location 2: Zella Court from its intersection with Fern to the end of the road.
    • Road Status: Road is closed to through traffic. Road is open to residents coming in and out of their homes.