SJWC Water Main Installation – Updates Week of 8/12

Dear RESA Community,

This week, there will be FULL CLOSURES from 8am-5pm, meaning that there will be no through traffic (the main thoroughfare is closed), no ins and outs for residents living on these streets. If you need to get in and out of your home, please leave before 8am/arrive back after 5pm.

Map of work is below:

Below is the list of streets that will be CLOSED each day due to work or work surrounding street entry:

Tuesday 8/13 – GREEN on map

  • La Verne Drive (no work will be performed after its intersection with Judith, only the portion in green)
  • Patricia Court (no road work, but ingress/egress affected by La Verne work)
  • Mountain View Court
  • Judith Court
  • June Court
  • Locust Drive
  • Naomi Court
  • Santa Ana Road (portion between Locust and Naomi only)

Wednesday 8/14 – BLUE on map

  • Madrone Drive (starting from its intersection with Broadway curving towards the Pavilion, only portion in blue)
  • Broadway Road
  • Idalyn Drive (no road work, but ingress/egress affected by Broadway work)
  • Helen Way (no road work, but ingress/egress affected by Madrone work)
  • Mary Alice Way (no road work, but ingress/egress affected by Madrone work)

**Virginia Drive/Beatrice Circle will NOT be affected, residents can exit going UP the hill; work still stop immediately before the intersection.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week o f 7/29

Dear RESA Community,

The main thoroughfare is open with detours all days. Hours are 8am-6pm.

Monday 7/29

  • Closure Location: Woolaroc Drive between Dorothy Way and Santa Ana Road.
  • Resident Access: All residents living down Santa Ana Road will be able to exit up towards Summit Road. Residents living within the closure will be able to enter and exit.

Tuesday 7/30 – Thursday 7/1

  • Work Location: Rolling closures starting from the top of the project, where Woolaroc meets Virdelle, ending all the way down to where Bayview meets Santa Ana. Progress on the closures will depend upon how quickly work is progressing, so it will vary each day.
  • Resident Access: Residents should expect roads to be closed through out the project through out each day, however detour signage and traffic control flagmen will be on site to assist with one-way traffic.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 7/22

Dear RESA Community,

Monday 7/22 & Tuesday 7/23

  • Closure Location: Bayview Drive between Zella Court and Woolaroc Drive.
  • Road Status: Main thoroughfare is OPEN to through traffic utilizing Zella Court as a detour.
  • Resident Access: All residents living within the closure will be able to enter and exit. There may be delays while WVCC crews move/set steel plates to safely get in and out.

Wednesday 7/24

  • Work Area: Bayview Drive between Woolaroc and Dorothy.
  • Closure Locations: 3 locations: (1) intersection of Gloria Court and Bayview Drive, (2) intersection of Bayview Drive and Dorothy Way, and (3) intersection of Woolaroc and Dorothy Way.
  • Detour: A detour route will be implemented via Zella Court.
  • Resident Access: All residents living within the closure will be able to enter and exit.

Thursday 7/25

  • Work Area: Woolaroc Drive between Bayview Drive and Dorothy Way.
  • Closure Locations: 3 locations: (1) intersection of Bayview Drive and Woolaroc Drive, (2) Intersection of Woolaroc Drive and Dorothy Way, and (3) Intersection of Santa Ana Road and Woolaroc Drive.
  • Resident Access: Residents living on Santa Ana Road will be able to exit up towards Summit. Residents living within the closure will be able to enter and exit. 

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 7/15

Dear RESA Community, 

The main thoroughfare in RE is CLOSED Monday & Tuesday and OPEN on Wednesday, CLOSED on Thursday. Hours are effective 8am-6pm.

Mon 7/15 – Tues 7/16

  • Closure Location: Santa Ana is closed immediately after its intersection with Sylvan Court, continuing down Santa Ana until immediately after its intersection with Bayview (same closure as Thursday 7/11).
  • Residents living on Lenore Court and Santa Ana Road will be able to exit down Locust Drive towards the general store.
  • Residents living on Eileen Ct will be able to exit on Bayview Drive to Summit Rd.
  • Residents living on Santa Ana Rd will be able to exit towards Woolaroc Drive to Summit Rd.

Wed 7/17

  • Closure Location: Lenore Court (closed entirely).
  • Main thoroughfare is OPEN, however, there will be points during the day where there will be traffic flaggers on Santa Ana and Lenore if equipment machines need to turn around, causing a slight delay.

Thursday 7/18

  • Closure Location: The roadway is closed from the intersection of Zella/Bayview, where Santa Ana meets Bayview, through Lenore/Santa Ana.
  • Main Thoroughfare: is CLOSED.
  • Residents living on Santa Ana and Eileen will be able to get in and out of their homes, however, please allot extra time for crews to put steel plates to drive over.

Pedestrian traffic through the work area will not be allowed each day due to safety concerns. Residents are urged to park outside of the closure zone to avoid delays.

Sincerely,