Oak/Redwood Drive where it intersects with Laurel Drive will be closed for culvert maintenance beginning TOMORROW Friday 6/7, continuing Monday 6/10 and Tuesday 6/11.
If you live at the end of Redwood Drive where it offshoots from Oak, please park at the Pavilion.
If you live near and around the area, please keep in mind that work will be occurring at this intersection.
For the next week, the main thoroughfare in RE will be open with detours. Hours are effective 8am-6pm.
WVCC will work with residents living within the closed areas to get in and out of their homes, however, they urge you to park outside of the work zone if possible.
Due to the nature of work, NO PEDESTRIAN TRAFFIC IS ALLOWED IN THE CLOSURE AREAS, listed below (this does not apply to those living in the closure zone).
Monday 6/3 and Tuesday 6/4
Work Location: Woolaroc from Virdelle to Santa Ana.
Road Status: CLOSED to through and pedestrian traffic.
Main Thoroughfare Access: OPEN with detours
Residents living on Virdelle will need to exit towards Bayview.
Residents living on Santa Ana will be able to enter/exit. Expect delays.
Wednesday 6/5
Work Location: Woolaroc between Santa Ana and Dorothy.
Road Status: CLOSED to through and pedestrian traffic.
Main Thoroughfare Access: OPEN with detours.
Residents living down Santa Ana will be able to exit up Woolaroc towards Summit.
Thursday 6/6
Work Location: Woolaroc between Dorothy and Bayview.
Road Status: CLOSED to through and pedestrian traffic.
Summary of the Main Thoroughfare for the Week Mon – Open Tues – Closed Wed – Closed Thurs – Open
Below are the updates for next week, effective from 8am-6pm.
Monday 5/27:
No Work Due to Memorial Day Holiday.
Tuesday-Wednesday 5/28-5/29:
Work Location: Bayview Drive and Santa Ana Road between Zella Court and Naomi Court.
Closure Type: CLOSED to through traffic, NO detour option.
Residents living above Zella Court will be able to exit via Summit.
Residents living on Naomi Court and below will be able to exit via towards Madrone.
Residents living within the closure will be able to get in and out, however, they are urged to park vehicles out of the work area to avoid potential delays.
Thursday 5/30:
Work Location: Woolaroc Drive between Virdelle Drive and Bayview Drive.
Closure Type: flaggers will be detouring people around the work site – anticipate minor delays.
Residents living down Santa Ana Road will be maintain access in and out.
On each of the following days, here is the summarized status of the main thoroughfare for Redwood Estates.
Monday 5/20 – OPEN with detours in place
Tuesday 5/21 – CLOSED
Wednesday 5/22 – OPEN
Thursday 5/23 – CLOSED
Friday 5/24 – No road work
Below are the details for road updates for both the upper and lower portions of the project for next week. All hours are 8am-6pm for road closures.
UPPER SECTION – Water Main Installation
Monday 5/20
Work Location: Bayview Drive between Gloria Court and Zella Court.
Closure Type: Bayview CLOSED, detour will be in place, utilizing Zella Court to go around the work.
Tuesday 5/21
Work Location: Intersection of Santa Ana Road and Bayview Drive, up Santa Ana Road.
Closure Type: Santa Ana CLOSED, residents who live on this street are urged to park vehicles outside of work areas to avoid delays (Bayview will remain open).
Wednesday 5/22
Work Locations
#1: Intersection of Santa Ana Road and Bayview Drive, up Santa Ana Road.
Closure Type: Santa Ana will be CLOSED. Residents affected by the closure on Santa Ana are urged to park on Eileen Court.
#2: Bayview Drive spanning from Gloria Court to Zella Court.
Closure Type: detour will be in place utilizing Zella Court to go around the road work.
Thursday 5/23
Work Location: Work begins at the intersection of Bayview Drive and Zella Court, working down Santa Ana to where it meets Naomi Court.
Closure Type: Bayview/Santa Ana is CLOSED with NO DETOUR OPTION.
Residents living on Naomi Court and below will exit towards the Pavilion.
Residents living above Zella Court and above will exit towards Summit.
Residents living within the closure are urged to park vehicles outside the work area.
LOWER SECTION – Road Paving
Monday 5/20
Work Location: Madrone Drive from the Redwood Estates Store down towards the Pavilion.
Closure Type: Madrone Drive is CLOSED. There will be a detour in place taking through traffic around, utilizing Redwood and Oak Drive.
Residents living on Mary Alice Way and Helen way will maintain access with delays as traffic flaggers will help get residents in and out of their homes.
Tuesday 5/21
Work Location: Broadway Road and La Verne Drive between Madrone Drive (store) and Virginia Drive/Beatrice Circle.
Closure Type: Broadway/La Verne is CLOSED
Residents living on Virginia Drive, Beatrice Circle, Broadway Road, La Verne Drive, and Idalyn Drive will maintain access with delays as traffic flaggers will help get residents in and out of their homes.
If there are any further updates, you will be notified next week. Thanks for your patience.
For the week of 5/13, there is work taking place from 8am-6pm. WVCC will accommodate residents living on these streets to get in and out of their homes. Due to the work being performed, there may be a delay, so please allow extra time for your transit.
On all days, the main thoroughfare is OPEN, with detours around work sites.
Monday 5/13:
ROLLING CLOSURE: only one of the streets below will be closed at a time. If one is closed, the other section will be open to allow traffic around work.
Woolaroc CLOSED first, once their work is done here, they will move onto…
Section of Bayview between Dorothy/Fern and Woolaroc CLOSED after the section mentioned above.
Tuesday 5/14:
Section of Bayview between Dorothy/Fern and Woolaroc CLOSED all day.
Traffic will be detoured around the work will be in place, using Woolaroc and Dorothy.
Wednesday 5/15:
ROLLING CLOSURE: only sections of the road will be closed at a time, allowing traffic around the work sites.
Sections of Woolaroc Drive will be closed at a given time. They will be starting at Virdelle, making their way towards Bayview.
Residents on Santa Ana will be able to enter/exit, but there may be delays, please allow extra time for your transit.
Thursday 5/16:
Section of Bayview from Woolaroc to Gloria will be closed all day.
Detour signage in place utilizing Zella.
Updates above are for the portion of the project that is in upper Redwood Estates. The road paving taking place on Naomi, Judith, Mountain View, Locust, La Verne is still taking place. Please see the previous email for those road closures: https://conta.cc/44AtFG3