SJWC Water Main Installation – Updates Week of 10/9

Dear RESA Community,

All road closures below are effective 8am-6pm:

Monday 10/9 – NO CLOSURES, ALL ROADS ARE OPEN

Tuesday 10/10-10-12

Locust Drive will be closed between Mountain View Court and the hair pin turn at Naomi Ct. The main thoroughfare from Upper to Lower RE is NOT open – See map of closures and timings below:

Any driveway within the limit of the trench for that day will be blocked 8am-6pm. Any resident above or below the limit of our trench WVCC will work to get out either via Summit or down towards the Pavilion.

This will be a rolling road closure and will follow us as WVCC works down the hill.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates for Week of 10/2

Dear RESA Community,

All road closures below are effective 8am-6pm:

Closed ONLY Monday 10/2

  • Locust Drive will be closed just before the Naomi Court hairpin turn.
  • There will be no IN/OUT access for residents who live in the blue highlight section below 8am-6pm. After Monday, WVCC will be able to get residents out through out the day. 
  • Image of the closure is below:

Monday 10/2 – Thursday 10/5

  • Santa Ana Road will be closed from Bayview Drive/Santa Ana Road to June Court.
  • WVCC will be closing the road at these locations because they are large enough to get vehicles turned around that are trying to get through. The actual work area will be from Naomi Court to Locust Drive (In front of the SJWC station).
  • WVCC will work with getting homeowners in and out of homes within the closed area safely. 

Sincerely,
RESA Office

SJWC Water Main Installation – Updates for Week of 9/25

Dear RESA Community,

This next week, there is only ONE area closed. All road closures are effective 8am-6pm.

Upper Section (same as last week)

  • Monday 9/25 – Thursday 9/28
    • Santa Ana Road will be closed from Bayview Drive/Santa Ana Road to June Court.
    • WVCC will be closing the road at these locations because they are large enough to get vehicles turned around that are trying to get through. The actual work area will be from Naomi Court to Locust Drive (In front of the SJWC station).
    • WVCC will work with getting homeowners in and out of homes within the closed area safely. 

NOTE: the project’s completion date could be near spring 2024. If you see any areas of the road where patches are, it is likely these are temporary cold patches that will be dug up again and replaced with the correct matching AC material.

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 9/18

Dear RESA Community,

This next week, there will be TWO areas of road closures – an upper and a lower section. Please see descriptions below. All road closures are effective 8am-6pm.

Upper Section:

  • Monday 9/18 – Thursday 9/21
    • Santa Ana Road will be closed from Bayview Drive/Santa Ana Road to June Court.
    • WVCC will be closing the road at these locations because they are large enough to get vehicles turned around that are trying to get through. The actual work area will be from Naomi Court to Locust Drive (In front of the SJWC station).
    • WVCC will work with getting homeowners in and out of homes within the closed area safely. 

Lower Section:

  • Monday 9/18 – Tuesday 9/19
    • WVCC will be working throughout Broadway at various locations.
    • Because the road is wider up on Broadway, the road will NOT be fully closed, just flaggers flagging one-way traffic at each location. 

Sincerely,
RESA Office

SJWC Water Main Installation – Updates Week of 9/11

Dear RESA Community,

This next week, there will be TWO areas of road closures – an upper and a lower section. Please see descriptions below. All road closures are effective 8am-6pm.

Upper Section:

  • Monday 9/11
    • Locust Drive closed (same road that has been worked on the last 2-weeks).
  • Tuesday 9/12 – Thursday 9/14
    • Santa Ana Road will be closed from Bayview Drive/Santa Ana Road to June Court.
    • WVCC will be closing the road at these locations because they are large enough to get vehicles turned around that are trying to get through. The actual work area will be from Naomi Court to Locust Drive (In front of the SJWC station).
    • WVCC will work with getting homeowners in and out of homes within the closed area safely. 

Lower Section:

  • Monday 9/11 – Thursday 9/14
    • Broadway/Madrone will be closed from the Pavilion to Nonno’s. The detour will be directed by traffic management and will take you around the construction area, though Redwood Drive.
    • WVCC is aware that the detour route became a bit clustered with vehicles last Thursday 9/7. They will have TMI flagging one way traffic on the detour road to allow vehicles to safely navigate the narrow road.

Sincerely,